IDOT Selection - Pinecrest Drive Bridge Replacement

We are pleased to have been selected by the Illinois Department of Transportation to work on Phases I and II of the Pinecrest Drive Bridge Replacement over Interstate 74 in East Peoria.

The current bridge is almost 60 years old and is both structurally and geometrically deficient. We are teaming with Prairie Engineers of Illinois, Kaskaskia Engineering Group and Fuhrmann Engineering to perform this work.