Glen Avenue Water Main / Peoria Heights, Illinois
Maurer-Stutz provided design and engineering services for the Village of Peoria Heights to replace aging water infrastructure. The project included 4,500 ft of new 16” and 20” transmission main, replacement of low service booster pumps, and elimination of the ground storage tank and high-level boosters. Directional drilling was used for 300 ft on steep terrain. The project was funded through an IEPA loan and an energy grant to reduce electric costs.



