Lakeland Culvert / Canton, Illinois
Maurer-Stutz was responsible for the construction observation for MFT funded extension of the existing Multi-Plate 19’-8” x 12’-8” Pipe Arch and earthwork to decrease embankment slopes. Work consisted of removals, dewatering, culvert assembly and placement, PCC toe walls and collars, riprap placement, embankment building QC, and placing seeding/erosion control blanket along the slope. Tasks included IDOT material certifications, QA PCC testing, web-based tracking of materials and quantities, and construction layout assistance.