Maurer-Stutz
  • Home
  • Services
    • Agricultural and Livestock Engineering
      • Livestock Facility Planning and Design
    • Conservation and Natural Resources
    • Site Development and Private Civil
      • Transportation
      • Surveying Support
    • Municipal and Public Works
      • Water Systems
      • Wastewater Systems
      • Transportation
      • Construction Engineering and Observation
    • Structural Design and Investigations
    • Surveying and Geospatial
      • GIS / Geospatial Solutions
      • Land Surveying
  • News
  • About Us
    • Licensure and Prequals
  • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

Ready to Play: Modernizing Playing Fields

July 6, 2021/in Projects/by Maurer-Stutz

As schools look to cut future costs, a major factor in this decision is ongoing maintenance. One such decision played out for the El Paso / Gridley School District as they decided whether to continue using natural grass for their football and soccer fields, or if they would choose another route for the future.

Maurer-Stutz, Inc. provided topographic survey and engineering design phase services for a regulation sized new football field with track and field events to replace an existing cinder track and football practice field. The design accounted for a future baseball field, softball field, and additional driving and parking areas.

The football field was designed with underground tile drainage and the track had interior edge drainage. Stormwater detention was sized to accommodate the future parking and driveway improvements.

Site design included demolition, plan layout, grading, coordination with on-site utilities, storm sewer, stormwater management and detention, assuring ADA compliance for building access and sidewalks, and assisting in obtaining the necessary permits.

https://www.mstutz.com/wp-content/uploads/2026/08/Logo-1030x301.webp 0 0 Maurer-Stutz https://www.mstutz.com/wp-content/uploads/2026/08/Logo-1030x301.webp Maurer-Stutz2021-07-06 13:54:342026-11-09 18:40:55Ready to Play: Modernizing Playing Fields
Search Search

Categories

  • Community
  • Culture
  • Geospatial Project
  • GIS Industry News
  • Insights
  • MSGS News
  • Projects

Tags

49" Monitor Admin Aerial Services AGLA announcement ArcGIS ArcGIS Earth ArcGIS Online Basic GIS Cartogrpahy Chattanooga Chicago conferences construction Consulting Dell drones East Peoria employee Enterprise GIS Esri Ethics examples Fiber Fulton GEOGRAPH GIS Hiking ILGISA ISU Jelly Belly Kanban Leadership Maps marketing MSI new Parks Partnership Portal Surveying UAS URISA VSM webgis
  • Home
  • Services
  • News
  • About Us
  • Careers
  • Contact
@2026 Maurer-Stutz. All Rights Reserved. | Privacy Policy
Link to: Built to Last: A Look Back at Maurer-Stutz Link to: Built to Last: A Look Back at Maurer-Stutz Built to Last: A Look Back at Maurer-Stutz Link to: Maurer Stutz Hosts Student Tours Link to: Maurer Stutz Hosts Student Tours Maurer Stutz Hosts Student Tours
Scroll to top Scroll to top Scroll to top