• Home
    • All Services
    • Agricultural
    • Conservation
    • Geospatial Services
    • Site Development
    • Structural
    • Surveying
    • Transportation
    • Wastewater
    • Water
  • News
  • About
    • Join Our Team
    • Full Time Positions
    • Internships
  • Contact
Menu

Maurer Stutz, Inc.

Peoria
IL
(309)693-7615
"Working With You By Design"

Maurer Stutz, Inc.

  • Home
  • Services
    • All Services
    • Agricultural
    • Conservation
    • Geospatial Services
    • Site Development
    • Structural
    • Surveying
    • Transportation
    • Wastewater
    • Water
  • News
  • About
  • Careers
    • Join Our Team
    • Full Time Positions
    • Internships
  • Contact

Rock Island Trail Bridge Over Knoxville Avenue

February 28, 2014 Trip Barton

Congratulations to the Peoria Park District on the successful overnight installation of the Rock Island Trail Bridge over Knoxville Avenue.  The 210 foot span was installed during a short closure of Knoxville Avenue during the overnight hours to minimize disruption to traffic.  The proximity to Ameren power lines made the installation challenging.  However, the installation went as planned and the project will now continue into the spring.

Maurer-Stutz has worked on this project from its inception through construction.  We hope that you will check out the bridge the next time that you are in the area.

← Drilling Has Begun!John Landsteiner - Olympic Curler and Civil Engineer →
Plans | SharePoint | Staff Email | Deltek | Privacy | Intranet | Terms and Conditions
© 2025 Maurer-Stutz, Inc.
Scroll to Top