Veterans Parkway (I-55 Business) Over Interstate 74 / Bloomington, Illinois
Maurer-Stutz provided Phase I structural study and Phase II design for the reconstruction of four interchange bridges carrying Veterans Parkway over I-74 in Bloomington. The project included complete bridge replacement with three-span steel beam superstructures, foundation analysis, geotechnical coordination, and preparation of structure plans and specifications. Services also included preliminary roadway and ramp design, and assistance with future I-74 widening considerations.



