McClugage Bridge / Peoria, Illinois
Maurer-Stutz is excited to be a part of the team that is providing construction engineering services to IDOT for the new eastbound span of the McClugage Bridge carrying US Route 150 over the Illinois River in the metropolitan Peoria area. The engineering team is led by a joint venture between Michael Baker International and HR Green. The new tied-arch bridge will have 3 through lanes, 2 full-width shoulder lanes and an adjacent 14’ multi-use path. Maurer-Stutz staff are responsible for performing quality assurance checks for all of the construction layout of not only the new river bridge elements, but also all of the approach work and widening along eastbound US Route 150 both east and west of the river crossing.



